ANI30003: Finalized Assessment Logic (Revised)
Assignment 2: Pre-Production Package (40%) Due May 24
Verification of the project's structural integrity. Deliverables must prove narrative logic and technical scaffold readiness.
1. Narrative Stream
- V1 Script: Full dialogue pass + implicit power hierarchies.
- Draft Storyboards: Visual flow for every scene (line art).
- Logline: Finalized one-sentence "anchor."
2. Design Stream
- Model Sheets: Character/Env turnarounds + expressions.
- Palette Evolution: Harmonic color mapping for key beats.
- Visual Keys: Definitive drawings of "Key Narrative Images."
3. Production Stream
- Shot Exemplaire: Layered PSD scaffold (Strata logic).
- Shot Planner: Excel logic mapped to Seq/Scene/Shot codes.
- Automation: Flow task templates established.
| Format | .docx, .pdf, and .psd (Layered) |
| Resolution | 1920x1080 (72 or 300dpi) |
| Naming | ANI30003_A2_GroupName_Asset.extension |
SparkPlus Moderation: Sunday May 17 – Sunday May 24. Required for individual grading.
FINAL A2 DEADLINE: Sunday, May 24, 2026 @ Midnight
Checkpoint 3: The Animatic Phase (Mandatory) Due May 31
Verification of temporal logic. We are auditing the transition from flat images to a timed, sonic experience.
Narrative Updates
- V2 Script: Revised timing based on board feedback.
- Acting Notes: Specific staging cues for production.
Animatic WIP
- Radio Play: Locked audio with initial dialogue/foley.
- Timed Boards: Boards synced to audio (Rough timing).
Technical Audit
- PSD Evolution: Updated layers reflecting visual direction.
- Link: Secure link to WIP Animatic in Dossier.
⚠️ COMPLIANCE: Failure to submit results in a 5% deduction from Assignment 3 total. Old assets are not accepted.
CHECKPOINT 3 DEADLINE: Sunday, May 31, 2026
Assignment 3: Final Package & Handover (30%) Due June 14
The definitive project handover. Assets must be "Production Ready" for Semester 2.
Locked Bible
- Final Script: Fully technical cues + dialogue.
- Handover Specs: Technical data for downstream artists.
- Binding: Collated Industry-standard Dossier PDF.
Locked Animatic
- High-Fid Export: Final timing, music, and sound design.
- Burn-ins: Timecode, Scene/Shot numbers, Project ID.
Visual Benchmark
- Definitive Shot: Finished film-quality PSD exemplaire.
- Strata Validation: Layering confirmed for production pipeline.
| Script Criteria | Consistency & Technical Staging (40%) |
| Animatic Criteria | Audio Sync, Design & Export Quality (40%) |
| POC Criteria | PSD Logic & Technical Readiness (20%) |
Final SparkPlus Window: Sunday June 7 – Sunday June 14.
FINAL HANDOVER: Sunday, June 14, 2026