✅ STATUS UPDATE: Gate 2 Audit is now complete. A 7-day extension remains active for all future deadlines (A2, A3, and Screening) due to the class pause.

ANI30003: Preproduction Aerial Roadmap (REVISED)

Internal Strategic Guide: Phases 06–14 Cycle
Updated May 10, 2026


Iteration 1: Structural Lock (COMPLETED)

Goal: Validate intention and technical readiness before high-fidelity commit.

  • Phase 06: Scaffolding Gate (Apr 12)COMPLETE
  • Phase 07: Visual TransferCOMPLETE
  • Phase 08: Line ClarityCOMPLETE
  • Phase 09: Audit Week (May 4–10)GATE 2 COMPLETE

Iteration 2: The Final Bible (IN PROGRESS)

Goal: Binding all artifacts into professional, industry-standard packages.

  • Phase 10: Binding (May 24)
    Assignment 2 Submission (Revised). Bible formatting, Live Flow setup, and artist assignments.
  • Phase 11: Design Commit
    High-fidelity push for definitive visual benchmark layers.
  • Phase 12: Pre-Production Lock
    Final lock of narrative, timing, and visual benchmarks.

Final: Handover & Screen

Goal: Closing the cycle and exhibiting the project's production DNA.

  • Phase 13: Handover (Jun 14)
    Assignment 3 Submission (Revised). Handover of Locked Script, Dossier, and Exemplaire.
  • Phase 14: Cinema Screening (Week 15)
    Final exhibition of the Locked Animatic. Celebration of the preproduction cycle.

Revised Strategic Timeline Checklist

Date Milestone Status
MAY 04 – 10 Gate 2: Audit Week COMPLETED
MAY 24 Assignment 2 Submission REVISED DEADLINE
JUNE 14 Assignment 3 Submission REVISED DEADLINE
WEEK 15 Cinema Event REVISED DATE

ANI30003 Animation Preproduction | Aerial Roadmap | 2026 (Revised)

Similar Posts

  • Phase 08 – Line Clarity

    Refining Performance, Power, and Palettes April 20 – April 26 The Goal: Line Clarity Phase 08 is about the transition from rough exploration to Line Clarity. We are moving from storyboard Thumbnails to Tie-downs and from Narrative written draft to the first version of your Script. This is the stage where we commit to the…

  • Phase 13 – Handover & Final Binding

    Phase 07: Visual Transfer Moving from Structural Skeleton to Visual Blueprint The Goal: Visual Clarity Phase 07 is about the Visual Transfer of your narrative. We are moving beyond bullet points into a First-Draft Script that utilizes full visual language. Simultaneously, your Design stream is tasked with “Finding the Key”—the core narrative image that defines…

  • Phase 12 – Production Lock

    Finalizing the Narrative, Timing, and Visual Benchmarks The Goal: Production Lock Phase 12 is about Finality. This phase marks the “Lock” on your core pre-production assets. We are moving from iteration to completion across your script, animatic, and definitive visual benchmark. By the end of this phase, the timing, sound design, and primary visual quality…

  • Phase 09 – Audit

    The Goal: Structural Integrity Phase 09 is about Structural Integrity. This is a critical milestone where we verify that the foundation of the film is technically and narratively unbreakable before the final Assignment 2 submission. We are looking for the removal of all placeholders. This is a full evaluation of your Sequence, Scene, and Shot…

  • Phase 11- Design Commit

    Establishing the Definitive Visual Benchmark The Goal: Design Commit Phase 11 marks the transition into High-Fidelity Production. While Assignment 2 focused on structural scaffolding, Phase 11 is about “Commitment.” We are moving beyond grey-tonal ruffs into the creation of high-fidelity assets for your project’s definitive visual benchmark shot. This is where the “Shot Exemplaire” evolves…