Preproduction Aerial Roadmap

✅ STATUS UPDATE: Gate 2 Audit is now complete. A 7-day extension remains active for all future deadlines (A2, A3, and Screening) due to the class pause.

ANI30003: Preproduction Aerial Roadmap (REVISED)

Internal Strategic Guide: Phases 06–14 Cycle
Updated May 10, 2026


Iteration 1: Structural Lock (COMPLETED)

Goal: Validate intention and technical readiness before high-fidelity commit.

  • Phase 06: Scaffolding Gate (Apr 12)COMPLETE
  • Phase 07: Visual TransferCOMPLETE
  • Phase 08: Line ClarityCOMPLETE
  • Phase 09: Audit Week (May 4–10)GATE 2 COMPLETE

Iteration 2: The Final Bible (IN PROGRESS)

Goal: Binding all artifacts into professional, industry-standard packages.

  • Phase 10: Binding (May 24)
    Assignment 2 Submission (Revised). Bible formatting, Live Flow setup, and artist assignments.
  • Phase 11: Design Commit
    High-fidelity push for definitive visual benchmark layers.
  • Phase 12: Pre-Production Lock
    Final lock of narrative, timing, and visual benchmarks.

Final: Handover & Screen

Goal: Closing the cycle and exhibiting the project's production DNA.

  • Phase 13: Handover (Jun 14)
    Assignment 3 Submission (Revised). Handover of Locked Script, Dossier, and Exemplaire.
  • Phase 14: Cinema Screening (Week 15)
    Final exhibition of the Locked Animatic. Celebration of the preproduction cycle.

Revised Strategic Timeline Checklist

Date Milestone Status
MAY 04 – 10 Gate 2: Audit Week COMPLETED
MAY 24 Assignment 2 Submission REVISED DEADLINE
JUNE 14 Assignment 3 Submission REVISED DEADLINE
WEEK 15 Cinema Event REVISED DATE

ANI30003 Animation Preproduction | Aerial Roadmap | 2026 (Revised)

Similar Posts

  • Phase 08 – Line Clarity

    Refining Performance, Power, and Palettes April 20 – April 26 The Goal: Line Clarity Phase 08 is about the transition from rough exploration to Line Clarity. We are moving from storyboard Thumbnails to Tie-downs and from Narrative written draft to the first version of your Script. This is the stage where we commit to the…

  • Phase 07 – Visual Clarity

    Moving from Structural Skeleton to Visual Blueprint The Goal: Visual Clarity Phase 07 is about the Visual Transfer of your narrative. We are moving beyond bullet points into a First-Draft Script that utilizes full visual language. Simultaneously, your Design stream is tasked with “Finding the Key”—the core narrative image that defines the temporality of your…

  • Phase 13 – Handover & Final Binding

    Phase 07: Visual Transfer Moving from Structural Skeleton to Visual Blueprint The Goal: Visual Clarity Phase 07 is about the Visual Transfer of your narrative. We are moving beyond bullet points into a First-Draft Script that utilizes full visual language. Simultaneously, your Design stream is tasked with “Finding the Key”—the core narrative image that defines…

  • Phase 11- Design Commit

    Establishing the Definitive Visual Benchmark The Goal: Design Commit Phase 11 marks the transition into High-Fidelity Production. While Assignment 2 focused on structural scaffolding, Phase 11 is about “Commitment.” We are moving beyond grey-tonal ruffs into the creation of high-fidelity assets for your project’s definitive visual benchmark shot. This is where the “Shot Exemplaire” evolves…

  • Phase 10 – Binding

    Phase 10: Binding & Polish Finalizing Assignment 2 & Production Handover The Goal: Binding & Polish Phase 10 is the final push for Assignment 2. This phase is dedicated to “Binding”—the professional collation of your artifacts into a cohesive Pre-Production Bible. We are applying the industry formatting standards you researched in Assignment 1 to ensure…

Leave a Reply

Your email address will not be published. Required fields are marked *